Références

« Working together and joining our resources, we can accomplish great things. »

Ronald Reagan, American actor and president

Pimiento

Key-words:

Drinkable water supply, Waste water management

Date:

2016

Client:

Federation of cooperatives of Migros

Partners:

-

Achievements:

Preliminary study
Rainwater management for several greenhouses, a processing hall and parkings.
Design of rainwater retention basins for the irrigation of the plants taking into account their specific demand.
Verifying of the volume of the resituated rainwater into the recipient and design of two additional retention basins.
Protection against flood and stormwater runnoff.

Development planning for the community of Bagnes

Key-words:

Infrastructures, Drinkable water supply

Date:

2013-ongoing

Client:

Services industriels de Bagnes

Achievements:

Preliminary study
Analysis of the drinkable water network and computations with a numerical model, diagnostics of the actual network, propositions for improvement and design of the additional pipes, decision support for specific projects.

Geo-database Dunet Bagnes

Key-words:

Infrastructures, Drinkable water supply

Date:

2012-en cours

Client:

Community of Bagnes

Partners:

CERT SA, SITTEL SA

Achievements:

Preliminary study
Adaption of the software Dunet to the drinkable water supply network of the community of Bagnes. Import of input data from the geo-database by a mouse click. Computation of the pression and the discharge in the whole network and export of the results to the geo-database.

Inventory of drinkable water infrastructures for the community of Billens

Key-words:

Infrastructures, Drinkable water supply

Date:

2014-2015

Client:

Community of Billens-Hennens

Achievements:

Preliminary study
Inventory of drinkable water infrastructures in a geo-database and description of structures (reservoirs, pump station, ...).
Analysis of the network with a numerical model.
Proposition for the improvement and optimisation of the network.
Financing scheme for computing the pay scale for drinkable water.
Elaboration of a control plan for water quality controls by the responsible of the community.

Drinkable water supply Val Ferret

Key-words:

Infrastructures, Drinkable water supply

Date:

2012-2013

Client:

Community of Orsières

Achievements:

Preliminary study
Analysis of the drinkable water network and computations with a numerical model, diagnostics of the actual network, propositions for improvement and design of the additional pipes, reservoirs and water intakes.

Rain retention basin

Key-words:

Infrastructures, Waste water management

Date:

2012

Client:

Community of Bagnes

Achievements:

Preliminary study
Design of a rain retention basin to reduce volume of rain water restituted to the torrents.
Hydrological and hydraulic study.

Development planning for a drinkable water supply network

Key-words:

Infrastructures, Drinkable water supply

Date:

2012-2013

Client:

Community of Sembrancher

Achievements:

Preliminary study
Analysis of the drinkable water network and computations with a numerical model, diagnostics of the actual network, propositions for improvement and design of the additional pipes, reservoirs and pipes. Elaboration of an operating plan.

Rain water retention basin for a hotel in Verbier

Key-words:

Infrastructures, Waste water management

Date:

2009-ongoing

Client:

3 Rocs

Partners:

Hubert&Torrent SA

Achievements:

Preliminary study and preliminary design project
Delimtation of watershed, dynamic computation of rain events, different possibilities for retaining basins and design of controlling structures.